Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipeline Project
Project Name: | Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipeline Project |
---|---|
Project Location: | Baku / Azerbaijan |
Client: | BP – BOTAS Joint Venture |
Project Start Date: | 05/2004 |
Completion Date: | 08/2005 |
Project Scope: | 42” - 430 km Pipeline Construction (Manual Welds, Crossings & Tie-ins), 19 Block Valve Station, 2 Pump Stations, 1 Pig Station, 2 Check Valve Station Construction. |